Euro Mechanical was awarded a lump-sum EPC contract to replace critical hydrogen-induced cracking (HIC) affected equipment and install a new 8-inch produced water line at Das Island.

The project was executed in a live offshore environment with zero safety incidents, ensuring uninterrupted operations and long-term asset integrity.

Replacement of Critical HIC Equipment

Scope of Work

  • Engineering, procurement and construction
  • Replacement of critical HIC-affected equipment
  • Fabrication and installation of 8-inch produced water line
  • Pre-commissioning, commissioning and handover

Key Facts

Key project information covering client, location, scope, and delivery timeline. A snapshot of the project’s operational and execution details.
Client
Major Oil & Gas Operator in UAE
Industry
Oil & Gas - Offshore
Location
Das Island, UAE
Contract Type
Lump-sum EPC
Duration
Oct 2024 - Oct 2025
Completion
October 2025
Worker performing precision industrial work

Our Solution & Scope of Work

Engineering

Detailed engineering and design with HIC assessment and fitness-for-service evaluation.

Procurement

Sourcing of critical materials and equipment as per project specifications.

Fabrication

Precision fabrication of equipment and spools in-house with strict quality control.

Installation

Offshore installation of equipment and new 8-inch produced water line with minimal disruption.

Results & Outcomes

Zero LTI

We deliver what we commit to, every time, without compromise.

Delivered On Schedule

Completed within planned timeline.

Minimized Downtime

Critical operations continued seamlessly.

Asset Integrity Restored